A party wall notice arrives through the door and it reads like the start of an argument. It usually is not. Your neighbour is doing what the law requires, and you now have a decision to make within fourteen days.

The decision is narrower than people think, and the consequences of each option are not well understood.

Your three options

Consent. You agree to the work going ahead as described. No surveyors are appointed, no award is prepared, and your neighbour can begin once the notice period expires.

Dissent. You do not agree, or you simply want the protection of the formal process. Surveyors are appointed and an award is prepared before work starts.

Do nothing. After fourteen days, dissent is deemed. This happens frequently, usually because the notice was put aside. The outcome is the same as dissenting, just slower.

What consenting actually gives up

This is the part worth understanding properly, because consent sounds like the neighbourly choice and it is the one that leaves you with least.

By consenting, you give up the award. That means you give up:

A schedule of condition. Nobody records the state of your property before work begins. If a crack appears in your wall during or after the works, there is no dated record of what was there beforehand, and establishing that the work caused it becomes considerably harder.

An agreed method of working. The award sets out how the work proceeds, hours of working, access arrangements and protective measures.

A defined route for damage. The award provides a mechanism for dealing with damage. Without one, your remedy is a civil claim, which is slower, more expensive and less certain.

You keep your rights at common law, and they are harder to use than a party wall award.

Why dissenting is not hostile

We say this to adjoining owners constantly: dissenting is not an objection to the work, and it does not stop or delay the project beyond the time the process takes.

It means the work gets recorded and regulated. In practice most building owners are better off for it as well, because the schedule of condition protects them from being blamed for pre-existing damage just as much as it protects you.

Where neighbours fall out over building work, it is nearly always because something went wrong and nobody had written down what the position was beforehand. The award is the thing that prevents that.

What happens if you dissent

Surveyor appointment. Either both owners agree on a single surveyor, the agreed surveyor, or each appoints their own. Our article on appointing a party wall surveyor covers the difference.

Schedule of condition. Your property is inspected and recorded, with photographs, before anything starts.

The award. The surveyors prepare it, setting out the works, the conditions attached, access, hours, and how damage will be handled. Both owners receive a copy.

Then work begins. The award does not block the project. It frames it.

Reading the notice properly

Before responding, check what the notice actually covers:

  • Which section of the Act it is served under, since that determines the notice period
  • What works are described, and whether they match what you have been told verbally
  • Whether plans and sections are included, which they must be for excavation works
  • The proposed start date

If the notice is incomplete or the works described do not match what is planned, that is worth raising. An invalid notice does not protect your neighbour either.

Our party wall surveyors page explains how we act for adjoining owners as well as building owners, and neighbourly disputes covers related matters. If a notice has landed, contact us and we will talk you through it.

Frequently asked questions

Can I stop the work by dissenting?

No. The Act gives your neighbour the right to carry out notifiable work. Dissenting gives you a regulated process, not a veto.

Will it cost me to dissent?

The Act deals with how the costs of the process are allocated, and they generally fall to the owner carrying out the work. We would explain how that applies to your situation before anything is agreed.

I consented and now there is damage. What can I do?

It is harder without an award, and not hopeless. Gather any photographs you have from before the work and speak to someone promptly.

What if I have already missed the fourteen days?

Dissent is deemed, so you have not lost the protection. Respond anyway so the process can start.